Where flow meets functional art

100hr Lucid Flow: Mandala Vinyasa Training

A 100HR Journey for Yoga Teachers Ready to Find their Creative Style, Master Mandala Vinyasa, and Teach from Mythology inspiration to make their classes Stand Out

SoHA Yoga Logo Icon Color

Does this resonate?

You love teaching yoga, yet you feel a bit held back. You’re teaching the same sequences you learned in your first training, and they’re starting to feel… repetitive. Mechanical. Like you’re just going through the motions.

Maybe you open Instagram and see all these creative teachers and you think, “I wish to feel that passionate, that empowered…  I wish to catch that same wave and share from inner inspiration and inner wisdom.”

Maybe you feel the pull toward something more artistic, more flowing, more creative – but you don’t know how to get there. You’ve been teaching the “usual sequence” for so long, you’ve forgotten what it feels like to play, experiment, and create from inspiration. There’s a little missing link.

You know there’s an artist inside you. You just don’t know how to bring it out.

You’re craving to feel passionate about what you offer. Fresh energy. A way to teach that feels alive again – where every class is an offering of something beautiful, something meaningful, something uniquely yours.

And maybe, quietly, you’re also hoping to find a specialization that sets you apart. Something you can offer workshops in. Something students will travel for.

Something that makes you stand out.

I found the answer in the water

My journey with Lucid Flow began in the ocean. Receiving a water healing session… something inside me shifted… years passed, and one day, as I was surfing, feeling the waves, and I realized – this is exactly how I want to move on the mat. No rigidity. Not following a fixed pattern. But flowing, responding, co-creating with this element in the moment. Water has been my greatest teacher ever since I birthed my son. It has shown me again and again where we come from, and how to be human again. 

I started weaving new 360° mandala patterns into my practice, drawing from Vedic  teachings, mythology and the water element. I studied fascia, spinal waves, aquatic bodywork. And something opened up inside me – this was my form of expressing an art that felt meaningful… purposeful. A functionally and fully healing artform. This was what I’d been searching for in my practice and in my life. A place to soften.

When I started teaching from this awareness, students would say, “I’ve never felt yoga like this before.” A space to feel free to move, to express, to create, to enjoy. And I watched teacher after teacher come alive again – rediscovering the joy and artistry they thought they’d lost.

Lucid Flow isn’t just another sequencing method. It’s permission to be an artist again. A healing artist.

SoHA Yoga Logo Icon Color

Master mandala vinyasa • Create your style

Most teacher trainings teach you to follow a template. You learn a sequence, and then you teach that sequence. Over and over again.

But what if teaching yoga could be more like playing music? Where you know the notes, you understand the rhythm, but every class is a unique composition – created in response to the students in front of you, the energy of the moment, the story you wish to tell? Spontaneous, intelligent, and fully functional movement wise. 

That’s Lucid Flow.

Here’s what makes it unique:

1. Mandala vinyasa specialization

 Learn to sequence in 360 degrees – a rare methodology that almost nobody else teaches stands out amongst thousands. Your students will move through all planes of space, experiencing yoga as circular, holistic, and deeply satisfying (nourishing ways). This becomes your signature offering.

2. Mythology as medicine

 Weave the stories of Vedic gods and goddesses into your practice and your teaching. Learn how these ancient myths speak to modern struggles – how Hanuman teaches devotion, Kali teaches transformation, Shiva teaches letting go. Your classes become journeys, not just smart workouts. Prayerful offerings that shift the way you show up in life.

3. Water therapy as a healing element

Through aquatic bodywork, spinal waves, and fluid movement principles, you’ll reconnect to the flow state – that feeling of being “in the zone.” This isn’t just theory. You’ll actually get in the water and experience it in your body, then use these somatic states to unfold your inner creator and bring the masterpiece to the mat.

4. Fascia-intelligent movement

Understand your connective tissue at a deep level. Learn to sequence for fascial health, creating practices that actually heal and restore the body – not just stretch it, but create mobility and longevity. This knowledge will transform how you teach, practice, and share anatomy, flows, and alignment.

5. Sustainability through yoga

Learn how to create sustainable income through your unique offerings. How to design workshops that sell. How to price your work. How to share your art with the world in a way that actually supports you financially.

This isn’t about learning more poses. It’s about finding what’s uniquely YOURS and learning to share it with confidence.

What you'll experience & learn

12 days immersed to dive deep into the art of lucid flow

Daily practice & embodiment

  • Morning Mandala Flows: 360° sequences that wake up your creative body
  • Meditation & Breathwork: Practices that bring you into flow states and the unified field of creation.
  • Yin & Restorative: Balance the fire with deep rest and smooth integration practices. 

The art of mandala vinyasa

  • 360° Degree Sequencing: Master spiral flows that move through all planes of inner and outer space
  • Soulful Krama: Learn the architecture of a complete, cohesive and fascia based class flow
  • Teaching Methodology: Practice cueing, pacing, and sharing your creative flows with confidence

Mythology & mantra

  • Vedic Stories Come Alive: Discover how ancient myths speak to modern life
  • Sacred Mantra: Learn the pronunciation and meaning of powerful mantras and invocations
  • Thematic Weaving: Create classes that tell stories, and move hearts

The 'flow state'

  • Fascia Intelligence: Understand connective tissue and how to sequence for true health
  • Functional Anatomy: Smart sequencing for spine, hips, twists, backbends, inversions
  • The Flow State: Embody the unified field where time and space disappear, and know how to create it for your students

The water element

  • Aquatic Bodywork: Submerge underwater for deep spinal wave exploration and release
  • Fluid Movement Principles: Let the water teach you about flow, surrender, and play
  • Fascia Intelligence, and Liquid Mobility

Healing arts integration

  • Thai Yoga Massage: Learn healing touch techniques to expand your offerings
  • Authentic Relating Practices: Release old patterns, upgrade your relating skills
  • Discover the latest research in anatomy and fascia technology

Build your career

  • Business of Yoga: Create sustainable income doing what you love
  • Workshop Design: Learn to craft offerings that students will travel for
  • Sharing Your Gifts: Practical tools to bring your unique voice into the world
SoHA Yoga Logo Icon Color

Your path forward...

Each of these three 100-hour modules can be taken individually or together for your full 300-hour Yoga Alliance certification. You choose your path.

1

Trust Your Calling

Your journey begins the moment you say ‘yes’ to that creative longing inside you. Save your spot using the button below, and we’ll send you everything you need to prepare for your arrival.

2

Arrive & Settle In

Land at our nature lush venue. Choose to stay with us at the resort or select from our recommended accommodations nearby. Settle into your home and meet your SōHA family.

3

Immerse in the Flow

For 12 days, practice, learn, play, and create. Move through mandala flows, dive into mythology, explore the water element, and discover your unique voice. Everything is held for you – just show up and let yourself be receive.

4

Teach Your Art

Graduate with your 100HR certification and something far more valuable: your own creative methodology, complete class structures ready to teach, meet incredible yogis from all over the world, and gain the confidence to stand out.

Irene's story: Finding her flow, finding her life

Irene felt a bit stuck. She’d been teaching for years, but something was missing. She watched a video of Daniela teaching Mandala Vinyasa, and something clicked within…

“I saw a video of Daniela surfing and giving tips about this flow… it was more connected to the water, as I feel I am. I decided to come back to Bali thanks to you to do this training.

The training gave me the push to make my choices. I was a bit confused about where to live, what to do. Now I’m living my dream – spending six months of the year in Bali, teaching Mandala Vinyasa, and the rest in Europe.

I’m teaching something almost nobody else teaches. It’s just the best practice ever. I don’t want to teach other styles anymore. This training gave me my art back – and it gave me my life back.”


  –  Irene, Yoga Teacher living between Bali & Europe

Lucid Flow - Mandala Vinyasa

100 Hour of Your 300 Hour

Coming Soon...

This training will give you:

Your investment:

$1,875 USD

Not included: Travel, accommodation, insurance, or additional meals. Recommended accommodation options available upon request.

 

To maintain the intimate container where real creative exploration happens, this training is limited to a small number of students. Lucid Flow typically sells out in advance.

FAQ's

This training is for you if:

  • You long to deepen your understanding of traditional yogic teachings for your own growth or to share with your students.
  • You’re ready to complete your 300-hour Yoga Alliance certification.
  • You feel stuck on your mat and crave fresh inspiration.
  • You want to explore new meditation practices and innovative ways to connect with yoga.
  • You wish to master the pronunciation and meaning of sacred mantras.
  • You want to refine your hands-on adjustments with real students.
  • Meditation & Lucid Flow Sadhana
    Daily 360° flows, Meditation, and Breath Techniques.
  • The Flow State
    What does it mean to be ‘in the zone’. Key points to achieve it and how to share it.
  • Fascia System
    Use the different qualities of your connective tissue, for creating a smart and healing lifestyle. Bring your body to its optimal health!
  • Yin Embodied Practices
    Soften and Rejuvenate in a balanced and healing environment. Experience Live Music and Blissful Soundcapes.
  • Vedic Mythology & Mantra
    Indulge in Mythology of the Gods and Goddesses. Learn to weave these themes in your classes and in your life. Unfold the meaning and sound of their powerful invocations.
  • Teaching Methodology / Krama Lab
    Master the art of Soulful Sequencing. Draw and dissect a complete class structure. Create, embody and share your own Flows.
  • Functional Anatomy
    Do’s and Don’ts for Yoga Sequencing. Spine, Breath, Hips, Twists, Backbends, and Inversions.
  • Water Dance
    Submerge underwater for a deep spinal wave dance. Enhance creativity within the water element… Play is the highest form of research.
  • Practicum
    Practice cueing and teaching each other through set exercises. Polish your sharing skills on and off the mat.
  • Business of Yoga
    Learn the key elements on how to be an outstanding yogi. Create an amazing life that fits your style and thrive doing what you love.
  • Thai Yoga Massage
    Feel, heal, and share the art of Healing Touch. Enhance Systems of Flow, Blood Stops, and Flushing circulation for the body’s re-balance and Qi Flow.
  • Authentic Relating Games
    Enjoy Self-Inquiry Games. Release and Rewire old patterns into new ways of healthy expression. Upgrade your Life standards and Mindset.

Our nutrition team has built a delicious menu to fit with the dietary needs and specific ingredients that nourish your body, supporting your journey into a lucid flow state. Together with our Chef, enjoy a daily buffet in our beautiful café, designed to complement your yoga practices. Savour this carefully curated Daily Brunch to sustain your energy and focus throughout your training.

Bond with fellow yogis who share your passions and path. Together, we create a vibrant family that inspires everlasting friendships and connections that will live in your heart from here on.

Daily Schedule

Your Typical Training Day

time schedule Lucid Flow

100HR Course Fees & Daily Brunch

Coming Soon!

Step fully into your path, combine this training with the 100hr Elements and save $200 USD.

The price includes:

Benefits of Yoga Teacher Training:

Not included: travel, accommodation, insurance or additional meals. Please feel welcome to inquire about additional recommended accommodation options.

Would you like to stay at Kayu Mama Resort & Spa?

Real People. Real Relationships.

Daniela Garza Rios

Lead Trainer, Invited faculty and guest teachers

Venue

Kayu Mama Resort And Spa

Kayu Mama Resort & Spa is a family-run eco-boutique hotel located in a secluded forest, only minutes from Uluwatu’s famous waves, restaurants, and white sand beaches.

A place to rebalance and heal with wholesome food and explore inspiring new approaches to healthy living.

At the core of everything we do is our deep respect for this island and its people and our desire to create in a way that contributes to the community around us and in a way that supports the delicate balance of this island ecosystem for generations to come.

Would you like to stay at Kayu Mama Resort & Spa?

Looking to stay at Kayu Mama?
We’re here to help — just reach out and we’ll book your room for you!
Simply click the button below to email us.

Joglo Suite

(Private)

(SOLD OUT!)

Tuition & Joglo Suite Private room

$3,250 USD

Elegant & spacious room with an abundance of natural light and a cozy daybed alcove.

  • 45 m² / 484 ft²
  • Garden view
  • Open-air bath
  • King-size bed
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

SOLD OUT

GLADAK SUITE

(Private)

(SOLD OUT!)

TUITION & GLADAK SUITE PRIVATE ROOM

$3,325 USD

The newest suite, featuring private balcony with a lush garden view and a modern-style bathroom

  • 30 m² / 323 ft²
  • Garden view
  • Indoor bathroom
  • King-size bed
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

SOLD OUT

Gladak Bungalow

(Private)

(SOLD OUT!)

Tuition & Gladak Bungalow Private

$3,325 USD

Intimate deluxe bungalow in authentic Indonesian style, offering a cozy ambience and serene pool views

  • 24 m² / 258 ft²
  • Garden view
  • Open-air bath
  • King-size bed
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

SOLD OUT

Gladak Room

(Private)

(SOLD OUT!)

TUITION & GLADAK PRIVATE ROOM

$3,175 USD

A bright room with a cozy terrace and a picturesque garden view.

  • 28 m² / 301 ft²
  • Garden view
  • Indoor bathroom
  • King-size bed
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Safe
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

SOLD OUT

GLADAK HUT​

(Private)

(SOLD OUT!)

Tuition & Gladak HUT private room

$3,175 USD

An intimate bungalow built in distinct Indonesian style with charming wooden details.

  • 24 m² / 258 ft²
  • Garden view
  • Open-air bath
  • King-size bed
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

*Click here

SOLD OUT

Gladak Bridal

(Private)

(SOLD OUT!)

TUITION & GLADAK BRIDAL PRIVATE ROOM

$3,030 USD

A standalone bungalow featuring an intimate room with dimmed lighting for cosy dreaming.

  • 24 m² / 258 ft²
  • Garden view
  • Open-air bath
  • King-size bed
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Safe
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

SOLD OUT

Joglo Suite

(Twin-shared)

(SOLD OUT!)

Tuition & Joglo Suite
Twin-Shared

$2,590 USD

Elegant & spacious twin-share room with an abundance of natural light and a cozy daybed alcove.

  • 45 m² / 484 ft²
  • Garden view
  • Open-air bath
  • 2x Single beds
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

SOLD OUT

Gladak Suite

(Twin-shared)

(SOLD OUT!)

Tuition & Gladak Suite
Twin-Shared

$2,630 USD

The newest twin-share suite, featuring private balcony with a lush garden view and a modern-style bathroom.

  • 30 m² / 323 ft²
  • Garden view
  • Indoor bathroom
  • 2x Single beds
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

SOLD OUT

Gladak Room

(Twin-shared)

(SOLD OUT!)

Tuition & Gladak Room Twin-Shared

$2,555 USD

A bright twin-share room with a cozy terrace and a picturesque garden view.

  • 28 m² / 301 ft²
  • Garden view
  • Indoor bathroom
  • 2x Single beds
  • Free Wi-Fi
  • Air conditioning
  • Daily housekeeping
  • Curated bath products
  • Safe
  • Room service
  • Non-smoking
  • Pool access
  • Laundry service
  • Transfer (fee-based)
  • Spa access (fee-based)
  • On-site restaurant

SOLD OUT

LOCAL BALI EXPAT?

We’ve got you covered!
Contact us for your private KITAS rate coupon